PD Air Manifold Extension
Alum, Flange x Flange, (6) 7/16″ Bolt Holes on 4 7/8″ Bolt Circle, Schedule 40 Pipe 36″ Overall Length. For Trinity Powerflow II.
CAD Drawing
Download CADSee also
Elbow 3″x90°
Elbow 3″x90°
Alum, Hose Barb x Flange(4) 9/16" Bolt Holes on 5" Bolt Circle.
Hose Clamp 1-5/16″-2 1/4″
Hose Clamp 1-5/16″-2 1/4″
300 SS, 1/2" Band, Worm drive
Air Manifold 3″ Assembly
Air Manifold 3″ Assembly
Alum, Schedule 40

